Cedegolo is a 72MW hydro power project. It is located on Oglio, Val Rabbia, Remulo, Val Zazza, Poglia river/basin in Lombardy, Italy. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1950. Buy the profile here.
Description
The project is currently owned by Electricite de France with a stake of 97.4%.
Cedegolo is a reservoir based project. The penstock length is 321m. The penstock diameter is 3.5m.
The hydro power project consists of 3 turbines, each with 24.4MW nameplate capacity.
The hydro power project consists of 2 turbines, each with 0.425MW nameplate capacity.
The project has 2 electric generators installed at the site. The generator capacity is 0.6 MVA.
The project has 3 electric generators installed at the site. The generator capacity is 29 MVA.
Development status
The project got commissioned in 1950.
For more details on Cedegolo, buy the profile here.