Chengdu Jintang Power Plant is a 3,200MW coal fired power project. It is located in Sichuan, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 2007. Buy the profile here.

Description

Guodian Sichuan Electric Power Generation and NWS Holdings are currently owning the project having ownership stake of 65% and 35% respectively.

It is a Steam Turbine power plant that is used for Baseload.

Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Expansion) consists of 2 steam turbines with 1,000MW nameplate capacity.

Development status

The project got commissioned in June 2007.

Contractors involved

Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit I) is equipped with Dongfang Turbine steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit II) is equipped with Dongfang Turbine steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

DEC Dongfang Electric Machinery supplied QFSN-600-2-22C electric generator for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit I).

DEC Dongfang Electric Machinery supplied QFSN-600-2-22C electric generator for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit I).

DEC Dongfang Electric Machinery supplied QFSN-600-2-22C electric generator for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit II).

DEC Dongfang Electric Machinery supplied QFSN-600-2-22C electric generator for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit II).

Dongfang Boiler Group supplied steam boiler for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit I).

Dongfang Boiler Group supplied steam boiler for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit I).

Dongfang Boiler Group supplied steam boiler for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit II).

Dongfang Boiler Group supplied steam boiler for the Chengdu Jintang Power Plant (Chengdu Jintang Power Plant Unit II).

For more details on Chengdu Jintang Power Plant, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.