Dangjin Coal Fired Power Plant is a 6,040MW coal fired power project. It is located in South Chungcheong, South Korea. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 1999. Buy the profile here.
Description
The project is developed and owned by Korea East-West Power. The company has a stake of 100%.
It is a Steam Turbine power plant that is used for Baseload.
Development status
The project got commissioned in June 1999.
Contractors involved
GS Engineering & Construction was selected to render engineering procurement construction services for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VII) project. GS Engineering & Construction was selected to render engineering procurement construction services for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VIII) project.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit I) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit II) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit III) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit IV) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit IX) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 1,020MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit V) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VI) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VII) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VIII) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.
Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit X) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 1,020MW nameplate capacity.
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit I).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit II).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit III).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit IV).
Mitsubishi Power supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit IX).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit V).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VI).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VII).
Doosan Enerbility supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VIII).
Mitsubishi Power supplied electric generator for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit X).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit I).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit II).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit III).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit IV).
DL Holdings supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit IX).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit V).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VI).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VII).
Doosan Enerbility supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit VIII).
Mitsubishi Power supplied steam boiler for the Dangjin Coal Fired Power Plant (Dangjin Coal Fired Power Plant Unit X).
Korea Electric Power Industrial Development is the O&M contractor for thermal power project, commencing from the year 2017.
For more details on Dangjin Coal Fired Power Plant, buy the profile here.