Davao Power Plant is a 300MW coal fired power project. It is located in Davao, Philippines. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in September 2015. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Davao Power Plant

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project was developed by Therma South. Aboitiz Equity Ventures, JERA, PCD Nominee and Others are currently owning the project having ownership stake of 51.87%, 27%, 14.88% and 6.25% respectively.

It is a Steam Turbine power plant that is used for Baseload.

Development status

The project got commissioned in September 2015.

Power purchase agreement

The power generated from the project is sold to Agusan del Sur Electric Cooperative under a power purchase agreement.

Contractors involved

Black & Veatch Holding was selected to render engineering procurement construction services for the Davao Power Plant (Davao Power Plant Phase I Unit I) project. Black & Veatch Holding was selected to render engineering procurement construction services for the Davao Power Plant (Davao Power Plant Phase I Unit II) project. Formosa Heavy Industries was selected to render engineering procurement construction services for the Davao Power Plant (Davao Power Plant Phase I Unit I) project. Formosa Heavy Industries was selected to render engineering procurement construction services for the Davao Power Plant (Davao Power Plant Phase I Unit II) project. Leighton Contractors (Philippines) was selected to render engineering procurement construction services for the Davao Power Plant (Davao Power Plant Phase I Unit I) project. Leighton Contractors (Philippines) was selected to render engineering procurement construction services for the Davao Power Plant (Davao Power Plant Phase I Unit II) project.

Davao Power Plant (Davao Power Plant Phase I Unit I) is equipped with Fuji Electric steam turbine. The phase consists of 1 steam turbine with 150MW nameplate capacity.

Davao Power Plant (Davao Power Plant Phase I Unit II) is equipped with Fuji Electric steam turbine. The phase consists of 1 steam turbine with 150MW nameplate capacity.

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Fuji Electric supplied electric generator for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit I).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Formosa Heavy Industries supplied steam boiler for the Davao Power Plant (Davao Power Plant Phase I Unit II).

Mitsubishi Power is the O&M contractor for thermal power project. The operation and maintenance contract commenced from 2021, for a period of 3 years.

For more details on Davao Power Plant, buy the profile here.

This content was updated on 11 November 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.