Davis is a 255MW hydro power project. It is located on Colorado river/basin in Arizona, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1942 and subsequently entered into commercial operation in 1951. Buy the profile here.
Description
The project is currently owned by U.S. Department of the Interior with a stake of 100%.
The net head of the project is 41m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 5 in number. The penstock diameter is 6.706m. The project generated 1,147.672 GWh of electricity.
The hydro power project consists of 1 turbine with 48MW nameplate capacity.
The hydro power project consists of 4 turbines, each with 51.75MW nameplate capacity.
Development status
The project construction commenced in 1942 and subsequently entered into commercial operation in 1951.
For more details on Davis, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.