Dogancay HES is a 62MW hydro power project. It is located on Seyhan river/basin in Adana, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2011 and subsequently entered into commercial operation in 2017. Buy the profile here.
Description
The project is currently owned by Enerjisa Enerji Uretim with a stake of 100%.
The penstock length is 514m. The project generated 169 GWh of electricity. The project cost is $74.092m.
Development status
The project construction commenced in 2011 and subsequently entered into commercial operation in 2017.