The Dung Quat Gas Power Plant III is 750MW gas fired power project. It is planned in Quang Ngai, Vietnam. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2027 and is expected to enter into commercial operation in 2028. Buy the profile here.
Description
The project is being developed and currently owned by Vietnam Electricity. The company has a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel will be procured from Blue Whale field.
Development status
The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2028.
For more details on Dung Quat Gas Power Plant III, buy the profile here.
About Vietnam Electricity
Vietnam Electricity (EVN) is an integrated electric utility. The company generates, transmits and distributes and sells energy. It produces power from hydro, coal, oil, and gas sources. EVN operates various power plants and electricity generation companies. It operates the entire national power transmission and distribution network and controls operation of the national power system through the National Load Dispatch Center. The company imports electricity from China and Laos, and exports power to Cambodia and Laos. It operates through power generation and distribution companies in Vietnam. EVN is headquartered in Hanoi, Vietnam.