Edincik Wind Farm is a 77.4MW onshore wind power project. It is located in Balikesir, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 2012 and subsequently entered into commercial operation in July 2013. Buy the profile here.

Description

The project is currently owned by Agaoglu Group with a stake of 100%.

The project generates 290.7GWh of electricity.

The Edincik Wind Farm (Edincik Wind Farm I), has 80m high towers.

The Edincik Wind Farm (Edincik Wind Farm II), has 91m high towers.

The Edincik Wind Farm (Edincik Wind Farm III), has 91m high towers.

Development status

The project is currently active. The project construction commenced in 2012 and subsequently entered into commercial operation in July 2013.

Contractors involved

Edincik Wind Farm (Edincik Wind Farm I) is equipped with Nordex N100 (2.5 MW) turbines. The phase consists of 12 turbines with 2.5MW nameplate capacity.

Edincik Wind Farm (Edincik Wind Farm II) is equipped with Nordex N117 (2.4 MW) turbines. The phase consists of 11 turbines with 2.4MW nameplate capacity.

Edincik Wind Farm (Edincik Wind Farm III) is equipped with Nordex N117/3000 turbines. The phase consists of 7 turbines with 3MW nameplate capacity.

Nordex is the O&M contractor for the Edincik Wind Farm (Edincik Wind Farm II). The operation and maintenance contract commenced from 2015, for a period of 6 years.

For more details on Edincik Wind Farm, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.