EP Newington Combined Cycle Power Plant is a 540MW gas fired power project. It is located in New Hampshire, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in October 2002. Buy the profile here.

Description

The project is currently owned by Nautilus Power.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Low Sulfur Diesel. The fuel is procured from Maritimes & Northeast (Spectra Energy).

The project generated 932,671MWh and emitted 1,189,526t of carbon dioxide emissions (CO2) a year.

The Gas fired project consists of 1 steam turbine with 235MW nameplate capacity.

Development status

The project got commissioned in October 2002.

Contractors involved

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of 7F.04 gas turbines.

GE Power supplied electric generator for the project.

GE Power supplied electric generator for the project.

Amec Foster Wheeler supplied steam boiler for the project.

Amec Foster Wheeler supplied steam boiler for the project.

For more details on EP Newington Combined Cycle Power Plant, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.