Fengzhen Power Plant is a 2,400MW coal fired power project. It is located in Inner Mongolia, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 1989. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Fengzhen Power Plant

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by China Huaneng Group.

It is a Steam Turbine power plant that is used for Baseload.

Fengzhen Power Plant (Fengzhen Power Plant Phase II Unit I) consists of 1 steam turbine with 600MW nameplate capacity.

Fengzhen Power Plant (Fengzhen Power Plant Phase II Unit II) consists of 1 steam turbine with 600MW nameplate capacity.

Fengzhen Power Plant (Fengzhen Power Plant Unit II) consists of 1 steam turbine with 200MW nameplate capacity.

Development status

The project got commissioned in November 1989.

Contractors involved

Fengzhen Power Plant (Fengzhen Power Plant Unit I) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.

Fengzhen Power Plant (Fengzhen Power Plant Unit III) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.

Fengzhen Power Plant (Fengzhen Power Plant Unit IV) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.

Fengzhen Power Plant (Fengzhen Power Plant Unit V) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.

Fengzhen Power Plant (Fengzhen Power Plant Unit VI) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.

Harbin Electric Machinery supplied QFSN 200-2 electric generator for the Fengzhen Power Plant (Fengzhen Power Plant Unit I).

Harbin Electric Machinery supplied QFSN 200-2 electric generator for the Fengzhen Power Plant (Fengzhen Power Plant Unit II).

Shanghai Boiler Works supplied steam boiler for the Fengzhen Power Plant (Fengzhen Power Plant Phase II Unit I).

Shanghai Boiler Works supplied steam boiler for the Fengzhen Power Plant (Fengzhen Power Plant Phase II Unit II).

Wuhan Boiler supplied steam boiler for the Fengzhen Power Plant (Fengzhen Power Plant Unit I).

Wuhan Boiler supplied steam boiler for the Fengzhen Power Plant (Fengzhen Power Plant Unit II).

Wuhan Boiler supplied steam boiler for the Fengzhen Power Plant (Fengzhen Power Plant Unit III).

Wuhan Boiler supplied steam boiler for the Fengzhen Power Plant (Fengzhen Power Plant Unit IV).

For more details on Fengzhen Power Plant, buy the profile here.

This content was updated on 14 October 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.