Fonsanta Wind Farm is a 50MW onshore wind power project. It is planned in Galicia, Spain. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in 2024. Buy the profile here.
Description
The project is being developed and currently owned by Greenalia Wind Power SLU. The company has a stake of 100%.
The project is expected to generate 153,163MWh electricity to offset 56,670t of carbon dioxide emissions (CO2) a year. The project cost is expected to be around $100.224m.
The project will have 112m high towers.
Development status
Post completion of the construction, the project is expected to get commissioned in 2024.
Contractors involved
Fonsanta Wind Farm (Fonsanta Wind Farm-I) will be equipped with Vestas Wind Systems V150-4.2 MW turbines. The phase consists of 11 turbines with 4.2MW nameplate capacity.
Fonsanta Wind Farm (Fonsanta Wind Farm-II) will be equipped with Vestas Wind Systems V150 turbine. The phase consists of 1 turbine with 3.8MW nameplate capacity.