Goktas II is a 155MW hydro power project. It is located on Seyhan river/basin in Adana, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2015. Buy the profile here.
Description
The project is currently owned by Aydem Yenilenebilir Enerji.
The project generated 623.14 GWh of electricity. The project cost is $444.244m.
The hydro power project consists of 2 turbines, each with 76.2MW nameplate capacity.
The project has 2 electric generators installed at the site.
Development status
The project got commissioned in 2015.