Hadong Thermal Power Plant is a 4,000MW coal fired power project. It is located in South Gyeongsang, South Korea. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1993 and subsequently entered into commercial operation in July 1997. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Hadong Thermal Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Korea Southern Power with a stake of 100%.

It is a Steam Turbine power plant that is used for Baseload.

Development status

The project construction commenced in 1993 and subsequently entered into commercial operation in July 1997.

Contractors involved

Doosan Enerbility was selected to render engineering procurement construction services for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VII) project. Doosan Enerbility was selected to render engineering procurement construction services for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VIII) project. Hyundai Engineering was selected to render engineering procurement construction services for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VII) project. Hyundai Engineering was selected to render engineering procurement construction services for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VIII) project.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit I) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit II) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit III) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit IV) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit V) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VI) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VII) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VIII) is equipped with Doosan Enerbility steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit I).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit II).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit III).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit IV).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit V).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VI).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VII).

Doosan Enerbility supplied electric generator for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VIII).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit I).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit II).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit III).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit IV).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit V).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VI).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VII).

Doosan Enerbility supplied steam boiler for the Hadong Thermal Power Plant (Hadong Thermal Power Plant Unit VIII).

For more details on Hadong Thermal Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.