Hao Set Power Plant is a 1,440MW coal fired power project. It is located in Shandong, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2011. Buy the profile here.
Description
It is a Steam Turbine power plant.
Hao Set Power Plant (Hao Set Power Plant Unit III) consists of 1 steam turbine with 360MW nameplate capacity.
Development status
The project got commissioned in November 2011.
Contractors involved
Hao Set Power Plant (Hao Set Power Plant Unit I) is equipped with Beijing Beizhong Steam Turbine Generator steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Hao Set Power Plant (Hao Set Power Plant Unit II) is equipped with Beijing Beizhong Steam Turbine Generator steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Hao Set Power Plant (Hao Set Power Plant Unit IV) is equipped with Dongfang Turbine steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Beijing Beizhong Steam Turbine Generator supplied electric generator for the Hao Set Power Plant (Hao Set Power Plant Unit I).
Beijing Beizhong Steam Turbine Generator supplied electric generator for the Hao Set Power Plant (Hao Set Power Plant Unit II).
Harbin Boiler supplied steam boiler for the Hao Set Power Plant (Hao Set Power Plant Unit III).