Hebei Datang International Fengrun Thermal Power Plant is a 600MW coal fired power project. It is located in Hebei, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2009. Buy the profile here.
Description
The project is currently owned by Datang International Power Generation with a stake of 84%.
It is a Steam Turbine with Cogen power plant.
The project cost is $405.978m.
Development status
The project got commissioned in 2009.
Contractors involved
Harbin Turbine was selected as the turbine supplier for the Coal fired project. The company provided 2 units of CN250/300-16.7/538/538/0.4 steam turbines, each with 300MW nameplate capacity.
Harbin Electric Machinery supplied QFSN-300-2 electric generator for the project.
Harbin Electric Machinery supplied QFSN-300-2 electric generator for the project.
Harbin Electric Machinery supplied QFSN-300-2 electric generator for the project.
Harbin Boiler supplied steam boiler for the project.
Harbin Boiler supplied steam boiler for the project.
Harbin Boiler supplied steam boiler for the project.
For more details on Hebei Datang International Fengrun Thermal Power Plant, buy the profile here.