Herbert A Wagner Coal Fired Power Plant is a 495MW coal fired power project. It is located in Maryland, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 1959. Buy the profile here.

Description

The project is currently owned by Talen Energy with a stake of 100%.

It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is bituminous. In case of shortage of bituminous the plant can also run on Natural Gas, Residual Fuel Oil. The fuel is procured from BGE Pipeline.

The project generated 184,787MWh of electricity.

Herbert A Wagner Coal Fired Power Plant (Herbert A Wagner Coal Fired Power Plant Unit I) consists of 1 steam turbine with 136MW nameplate capacity.

Development status

The project got commissioned in January 1959.

Contractors involved

Herbert A Wagner Coal Fired Power Plant (Herbert A Wagner Coal Fired Power Plant Unit II) is equipped with Siemens Energy steam turbine. The phase consists of 1 steam turbine with 359MW nameplate capacity.

Babcock & Wilcox Enterprises supplied steam boiler for the Herbert A Wagner Coal Fired Power Plant (Herbert A Wagner Coal Fired Power Plant Unit I).

Babcock & Wilcox Enterprises supplied steam boiler for the Herbert A Wagner Coal Fired Power Plant (Herbert A Wagner Coal Fired Power Plant Unit II).

For more details on Herbert A Wagner Coal Fired Power Plant, buy the profile here.