Hongrin is a 480MW hydro power project. It is located on Lac de l’Hongrin river/basin in Vaud, Switzerland. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1966 and subsequently entered into commercial operation in 1971. Buy the profile here.
Description
The project was developed by Forces Motrices Hongrin-Leman. Romande Energie Commerce, Alpiq Holding, Groupe E and City of Lausanne are currently owning the project having ownership stake of 41.14%, 39.29%, 13.14% and 6.43% respectively.
Hongrin is a pumped storage project. The hydro reservoir capacity is 52 million cubic meter. The gross head of the project is 878m. The project generated 520 GWh of electricity.
Development status
The project construction commenced in 1966 and subsequently entered into commercial operation in 1971.
Contractors involved
Hongrin (Hongrin Phase I) is equipped with Andritz Hydro pelton turbines. The phase consists of 4 turbines.
Hongrin (Hongrin Phase II Extension ) is equipped with Andritz Hydro pelton turbines. The phase consists of 2 turbines with 120MW nameplate capacity.
The electric generators for the project were procured from Andritz Hydro and GE Renewable Energy.
For more details on Hongrin, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.