Jaguara is a 424MW hydro power project. It is located on Grande river/basin in Sao Paulo, Brazil. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1966 and subsequently entered into commercial operation in 1971. Buy the profile here.

Description

Engie and Others are currently owning the project having ownership stake of 68.71% and 31.29% respectively.

Jaguara is a run-of-river project. The hydro reservoir capacity is 90 million cubic meter.

The nameplate capacity of electric generator(s) installed at the site is 112 MVA.

Development status

The project construction commenced in 1966 and subsequently entered into commercial operation in 1971.

Contractors involved

Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 4 units of francis turbines, each with 106MW nameplate capacity.

For more details on Jaguara, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.