Jamba ia Oma is a 79MW hydro power project. It is planned on Cunene river/basin in Huambo, Angola. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the dormant stage. It will be developed in a single phase. Buy the profile here.
Description
The project is being developed and currently owned by Gabinete para a Administracao da Bacia Hidrografica do rio Cunene.
The hydro reservoir capacity is planned to be 11 million cubic meter. The net head of the project will be 38.8m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 3 in number. The penstock length will be 80m. The penstock diameter will be 4.15m.
The hydro power project consists of 3 units of francis turbines.
For more details on Jamba ia Oma, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.