Jilin Huaneng Siping Wind Farm Expansion is a 47.5MW onshore wind power project. It is located in Jilin, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 2019 and subsequently entered into commercial operation in 2020. Buy the profile here.
Description
The project is developed and owned by Huaneng Jilin Power Generation.
The project generates 140,000MWh of electricity.
The Tubular Steel towers installed at the Jilin Huaneng Siping Wind Farm Expansion (Jilin Huaneng Siping Wind Farm Expansion - Phase I), site are 100m high.
The Tubular Steel towers installed at the Jilin Huaneng Siping Wind Farm Expansion (Jilin Huaneng Siping Wind Farm Expansion - Phase II), site are 100m high.
Development status
The project is currently active. The project construction commenced in 2019 and subsequently entered into commercial operation in 2020.
Contractors involved
Jilin Huaneng Siping Wind Farm Expansion (Jilin Huaneng Siping Wind Farm Expansion - Phase I) is equipped with Envision Energy EN141-3.0 turbines. The phase consists of 15 turbines with 3MW nameplate capacity.
Jilin Huaneng Siping Wind Farm Expansion (Jilin Huaneng Siping Wind Farm Expansion - Phase II) is equipped with Envision Energy EN141-2.5 turbine. The phase consists of 1 turbine with 2.5MW nameplate capacity.
For more details on Jilin Huaneng Siping Wind Farm Expansion, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.