Kakkad is a 50MW hydro power project. It is located on Pamba river/basin in Kerala, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1999. Buy the profile here.
Description
The project is currently owned by Kerala State Electricity Board.
Kakkad is a run-of-river with pondage project. The hydro reservoir capacity is 39.22 million cubic meter. The gross head of the project is 132.6m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The penstock length is 25m. The penstock diameter is 2.65m. The project generated 262 GWh of electricity.
Development status
The project got commissioned in 1999.
Contractors involved
Bharat Heavy Electricals was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 25MW nameplate capacity.
Bharat Heavy Electricals supplied electric generator(s) for the project.
For more details on Kakkad, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.