Karabatan Power Plant is a 312MW gas fired power project. It is located in Atyrau, Kazakhstan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in April 2020. Buy the profile here.
Description
The project is developed and owned by Karabatan Utility Solutions.
It is a CCGT with Cogen power plant. The fuel is procured from Tengiz field.
The project cost is $320.78m.
Development status
The project got commissioned in April 2020.
Contractors involved
Doosan Enerbility was selected to render engineering procurement construction services for the gas fired power project.
The Gas fired project have been supplied by Doosan Skoda Power and Siemens.
Doosan Skoda Power supplied electric generator for the project.
Doosan Skoda Power supplied electric generator for the project.
For more details on Karabatan Power Plant, buy the profile here.