Krasnopolyanskaya-2 is an 82MW hydro power project. It is located on Mzymta river/basin in Krasnodar Krai, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2010 and subsequently entered into commercial operation in 2014. Buy the profile here.
Description
The project is currently owned by Greta Energy RU.
The net head of the project is 180m. The project generated 170 GWh of electricity. The project cost is $154.16m.
The hydro power project consists of 4 turbines, each with 20.5MW nameplate capacity.
Development status
The project construction commenced in 2010 and subsequently entered into commercial operation in 2014.