Kyiv PSPP is a 255.912MW hydro power project. It is planned on Dneipr river/basin in Kiev, Ukraine. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the partially active stage. It will be developed in multiple phases. The project construction is likely to commence in 1970 and is expected to enter into commercial operation in 1972. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Kyiv PSPP

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project is being developed by Dnepr-SpetsGydroEnergoMontazh Open Joint-Stock and UkrHydroEnergo. The project is currently owned by UkrHydroEnergo with a stake of 100%.

Kyiv PSPP is a pumped storage project. The gross head and net head of the project will be 73m and 72.2m respectively. The project is expected to generate 229.3 GWh of electricity.

The Kyiv PSPP (Kyiv_Rehabilitated Unit 6) has 1 electric generator that will be installed at the Kyiv PSPP (Kyiv_Rehabilitated Unit 6) site.

Development status

The project construction is expected to commence from 1970. Subsequent to that it will enter into commercial operation by 1972.

Contractors involved

Kyiv PSPP (Kyiv_Active) will be equipped with Ukrainian Energy Machines pump turbines. The phase consists of 3 turbines with 38MW nameplate capacity.

Kyiv PSPP (Kyiv_Rehabilitated Unit 2) will be equipped with Ukrainian Energy Machines francis turbine. The phase consists of 1 turbine with 48.312MW nameplate capacity.

Kyiv PSPP (Kyiv_Rehabilitated Unit 6) will be equipped with Ukrainian Energy Machines francis turbine. The phase consists of 1 turbine with 46.8MW nameplate capacity.

Kyiv PSPP (Kyiv_Under Rehab Unit 4) will be equipped with Ukrainian Energy Machines francis turbine. The phase consists of 1 turbine with 46.8MW nameplate capacity.

Electrotyazhmash is expected to supply 3 electric generators for the Kyiv PSPP (Kyiv_Active).

Electrotyazhmash is expected to supply 1 electric generator for the Kyiv PSPP (Kyiv_Rehabilitated Unit 2).

Electrotyazhmash is expected to supply 1 electric generator for the Kyiv PSPP (Kyiv_Under Rehab Unit 4).

For more details on Kyiv PSPP, buy the profile here.

About UkrHydroEnergo

UkrHydroEnergo is a hydro power generating company that specializes in power infrastructure, power regulation, coverage of peak loads, frequency regulation and mobile emergency reserve in united energy systems. The company is headquartered in Vyshgorod, Kiev, Ukraine.

This content was updated on 11 November 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.