Lariang-7 is a 257.6MW hydro power project. It is planned in Central Sulawesi, Indonesia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2027 and is expected to enter into commercial operation in 2030. Buy the profile here.
Description
The project is being developed and currently owned by Integrated Design & Engineering Holdings.
Lariang-7 is a reservoir based project.
Development status
The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2030.
For more details on Lariang-7, buy the profile here.
About Integrated Design & Engineering Holdings
Integrated Design & Engineering Holdings Co Ltd (IDE) is a provider of engineering and consulting services. It offers planning, design, supervision and construction of infrastructure projects in the fields of energy, transportation, resources, and urban and public sector development. IDE also manufactures and sells water turbines, system control and electric power-related equipment such as line taps for power transmission and distribution networks. It carries out the construction of substation and power transmission stations. The company also executes planning and design of urban buildings and leasing of real estate properties. It conducts redevelopment planning of areas and buildings, and refurbishment of historic buildings. The company operates in Europe, the Americas, and Asia. IDE is headquartered in Chiyoda-ku, Tokyo, Japan.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.