Ligga is a 332MW hydro power project. It is located on Lulealven river/basin in Norrbotten, Sweden. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1951 and subsequently entered into commercial operation in 1954. Buy the profile here.
Description
The project is currently owned by Vattenfall with a stake of 100%.
The hydro reservoir capacity is 5.4 million cubic meter. The gross head of the project is 40m. The project generated 1,656 GWh of electricity.
The hydro power project consists of 1 turbine with 175MW nameplate capacity.
Development status
The project construction commenced in 1951 and subsequently entered into commercial operation in 1954.
Contractors involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 units of kaplan turbines, each with 78MW nameplate capacity.
GE Renewable Energy supplied 1 electric generator for the project. The generator capacity is 185 MVA.
For more details on Ligga, buy the profile here.