Majuba Power Station is a 4,110MW coal fired power project. It is located in Mpumalanga, South Africa. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1983 and subsequently entered into commercial operation in April 1996. Buy the profile here.
Description
The project is currently owned by Eskom Holdings SOC.
It is a Steam Turbine power plant that is used for Baseload.
The project cost is $2,985.64m.
Development status
The project construction commenced in 1983 and subsequently entered into commercial operation in April 1996.
Contractors involved
Majuba Power Station (Majuba Power Station Unit I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 657MW nameplate capacity.
Majuba Power Station (Majuba Power Station Unit II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 657MW nameplate capacity.
Majuba Power Station (Majuba Power Station Unit III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 657MW nameplate capacity.
Majuba Power Station (Majuba Power Station Unit IV) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 713MW nameplate capacity.
Majuba Power Station (Majuba Power Station Unit V) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 713MW nameplate capacity.
Majuba Power Station (Majuba Power Station Unit VI) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 713MW nameplate capacity.
GE Power supplied electric generator for the Majuba Power Station (Majuba Power Station Unit I).
GE Power supplied electric generator for the Majuba Power Station (Majuba Power Station Unit II).
GE Power supplied electric generator for the Majuba Power Station (Majuba Power Station Unit III).
GE Power supplied electric generator for the Majuba Power Station (Majuba Power Station Unit IV).
GE Power supplied electric generator for the Majuba Power Station (Majuba Power Station Unit V).
GE Power supplied electric generator for the Majuba Power Station (Majuba Power Station Unit VI).
Mitsubishi Power supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit I).
Steinmuller Africa supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit I).
Steinmuller Africa supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit II).
Mitsubishi Power supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit II).
Mitsubishi Power supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit III).
Steinmuller Africa supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit III).
Steinmuller Africa supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit IV).
Mitsubishi Power supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit IV).
Mitsubishi Power supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit V).
Steinmuller Africa supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit V).
Steinmuller Africa supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit VI).
Mitsubishi Power supplied steam boiler for the Majuba Power Station (Majuba Power Station Unit VI).