Mezzocorona is a 54MW hydro power project. It is located on Noce river/basin in Trentino-Alto Adige, Italy. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1927 and subsequently entered into commercial operation in 1929. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Mezzocorona

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Electricite de France with a stake of 97.4%.

Mezzocorona is a reservoir based project. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The project generated 209.67 GWh of electricity.

Development status

The project construction commenced in 1927 and subsequently entered into commercial operation in 1929.

Contractors involved

Ercole Marelli Power supplied 2 electric generators for the project. The generator capacity is 12 MVA.

For more details on Mezzocorona, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.