Moglice is a 197MW hydro power project. It is located on Devoll river/basin in Korce, Albania. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2015 and subsequently entered into commercial operation in 2020. Buy the profile here.

Description

The project was developed by Devoll Hydropower and is currently owned by Statkraft with a stake of 100%.

The hydro reservoir capacity is 400 million cubic meter. The gross head of the project is 300m. The project generated 450 GWh of electricity. The project cost is $471.17m.

Development status

The project construction commenced in 2015 and subsequently entered into commercial operation in 2020.

Contractors involved

GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines.

GE Renewable Energy supplied 2 electric generators for the project. The generator capacity is 104.5 MVA.

For more details on Moglice, buy the profile here.