Mosenergo TEP-21 Power Plant is a 1,350MW gas fired power project. It is located in Moscow, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1960 and subsequently entered into commercial operation in October 1963. Buy the profile here.
Description
The project is currently owned by Mosenergo with a stake of 100%.
It is a Steam Turbine with Cogen power plant that is used for Baseload.
The project generated 9,190,000MWh of electricity.
Development status
The project construction commenced in 1960 and subsequently entered into commercial operation in October 1963.
Contractors involved
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit I) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit II) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit III) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit IV) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit IX) is equipped with Leningradsky Metallichesky Zavod T-250-240 steam turbine. The phase consists of 1 steam turbine with 250MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit V) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit VI) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit VII) is equipped with Ural Turbine Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit VIII) is equipped with Leningradsky Metallichesky Zavod T-250-240 steam turbine. The phase consists of 1 steam turbine with 250MW nameplate capacity.
Mosenergo TEP-21 Power Plant (Mosenergo TEP-21 Power Plant Unit X) is equipped with Leningradsky Metallichesky Zavod PT-80-130 steam turbine. The phase consists of 1 steam turbine with 80MW nameplate capacity.
The electric generators for the project were procured from NPO Elsib and Ural Turbine Works.
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.
For more details on Mosenergo TEP-21 Power Plant, buy the profile here.