Omega Hills Landfill Power Project is a 12.8MW biopower project. It is located in Wisconsin, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1985. Buy the profile here.

Description

The project is currently owned by WM Renewable Energy.

The process of landfill has been adopted in this project to release the stored energy from the feed. Landfill gas is used as a feedstock to power the project.

The project consists of 2 turbines each with 3.1 MW nameplate capacity and 2 turbines each with 3.3 MW nameplate capacity respectively.

Development status

The project got commissioned in December 1985.

For more details on Omega Hills Landfill Power Project, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.