Panjin Cogeneration Power Plant is a 700MW coal fired power project. It is located in Liaoning, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2014. Buy the profile here.
Description
The project is currently owned by China Resources Power Holdings with a stake of 100%.
It is a Steam Turbine with Cogen power plant.
The project cost is $470.4m.
Development status
The project got commissioned in 2014.
Contractors involved
Harbin Electric was selected to render engineering procurement construction services for the coal fired power project.
Harbin Steam Turbine Factory was selected as the turbine supplier for the Coal fired project. The company provided 2 units of CC350 / 245-24.2 / 566/566 steam turbines, each with 350MW nameplate capacity.
Harbin Electric Machinery supplied QFSN 350-2 electric generator for the project.
Harbin Electric Machinery supplied QFSN 350-2 electric generator for the project.
Harbin Electric Machinery supplied QFSN 350-2 electric generator for the project.
Harbin Boiler supplied steam boiler for the project.
Harbin Boiler supplied steam boiler for the project.
Harbin Boiler supplied steam boiler for the project.
For more details on Panjin Cogeneration Power Plant, buy the profile here.