Pluspetrol Tucuman (CTT) Power plant is a 470MW gas fired power project. It is located in Tucuman, Argentina. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in September 1996. Buy the profile here.
Description
YPF and GE Energy Financial Services are currently owning the project having ownership stake of 75.01% and 24.99% respectively.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from Pluspetrol SA.
The project generated 2,179,240MWh of electricity.
Development status
The project got commissioned in September 1996.
Contractors involved
Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit I) is equipped with Siemens SGT5-2000E gas turbine. The phase consists of 1 gas turbine with 156MW nameplate capacity.
Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit II) is equipped with Siemens SGT5-2000E gas turbine. The phase consists of 1 gas turbine with 156MW nameplate capacity.
Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 158MW nameplate capacity.
Siemens supplied electric generator for the Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit I).
Siemens supplied electric generator for the Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit I).
Siemens supplied electric generator for the Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit II).
Siemens supplied electric generator for the Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit II).
GE Power supplied electric generator for the Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit III).
GE Power supplied electric generator for the Pluspetrol Tucuman (CTT) Power plant (Tucuman (CTT) Power plant Unit III).
John Cockerill Group supplied steam boiler for the project.
John Cockerill Group supplied steam boiler for the project.
For more details on Pluspetrol Tucuman (CTT) Power plant, buy the profile here.