Poyrazgolu is a 48.5MW onshore wind power project. It is located in Balikesir, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2015. Buy the profile here.

Description

The project was developed by Demirer Enerji Uretim, Ortadogu Energy and Ufuk Enerji Elektrik Uretim. The project is currently owned by Ufuk Enerji Elektrik Uretim with a stake of 100%.

The turbines installed on the project are using Hybrid towers.

Development status

The project is currently active. The project got commissioned in October 2015.

Contractors involved

Poyrazgolu (Poyrazgolu- Phase I) is equipped with Enercon turbines. The phase consists of 15 turbines, each with 2.3MW nameplate capacity.

Poyrazgolu (Poyrazgolu- Phase II) is equipped with Enercon turbines. The phase consists 6 turbines.

For more details on Poyrazgolu, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.