Prek Liang II is a 66MW hydro power project. It is planned on Prek Liang river/basin in Ratanakiri, Cambodia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2028 and is expected to enter into commercial operation in 2030. Buy the profile here.
Description
The project is being developed and currently owned by Korea South-East Power.
The hydro reservoir capacity is planned to be 157 million cubic meter. The net head of the project will be 153.9m. The penstock length will be 134m. The penstock diameter will be 3m.
The hydro power project consists of 2 units of francis turbines.
Development status
The project construction is expected to commence from 2028. Subsequent to that it will enter into commercial operation by 2030.
For more details on Prek Liang II, buy the profile here.
About Korea South-East Power
Korea South-East Power Co Ltd (KOSEP), a subsidiary of Korea Electric Power Corp, is an electric utility. It produces and sells electricity in domestic and international markets. The company develops electric power resources; and generates electricity using coal, gas, steam, hydro, solar and other sources. KOSEP trades electricity through Korea Power Exchange to KEPCO as its trading partner. The company operates various thermal power plants, combined cycle power plants, internal combustion, hydro, solar and other renewable energy plants. KOSEP is headquartered in Jinju-si, Republic of Korea (South Korea).
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.