Renace II is an 114MW hydro power project. It is located on Cahabon river/basin in Alta Verapaz, Guatemala. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2012 and subsequently entered into commercial operation in 2016. Buy the profile here.

Description

The project is currently owned by Corporacion Multi Inversiones.

The gross head of the project is 335m. The project cost is $270m.

Development status

The project construction commenced in 2012 and subsequently entered into commercial operation in 2016.

Contractors involved

Cobra Gestion De Infraestructuras SLU was selected to render engineering procurement construction services for the hydro power project.

Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 4 units of pelton turbines, each with 30.4MW nameplate capacity.

Alconza Berango, S.L supplied 4 electric generators for the project. The generator capacity is 33.76 MVA.

For more details on Renace II, buy the profile here.