Ribatejo Power Station is a 1,200MW gas fired power project. It is located in Lisbon, Portugal. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2004. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Ribatejo Power Station

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Energias de Portugal with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant.

Development status

The project got commissioned in 2004.

Contractors involved

PROMANEC - Engineering & Construction and Siemens were selected to render engineering procurement construction services for the gas fired power project.

Ribatejo Power Station (Ribatejo Power Station Block I) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine with 265MW nameplate capacity.

Ribatejo Power Station (Ribatejo Power Station Block I) is equipped with Siemens SST5-3000 steam turbine. The phase consists of 1 steam turbine with 135MW nameplate capacity.

Ribatejo Power Station (Ribatejo Power Station Block II) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine with 265MW nameplate capacity.

Ribatejo Power Station (Ribatejo Power Station Block II) is equipped with Siemens SST5-3000 steam turbine. The phase consists of 1 steam turbine with 135MW nameplate capacity.

Ribatejo Power Station (Ribatejo Power Station Block III) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine with 265MW nameplate capacity.

Ribatejo Power Station (Ribatejo Power Station Block III) is equipped with Siemens SST5-3000 steam turbine. The phase consists of 1 steam turbine with 135MW nameplate capacity.

Siemens supplied SGen5-2000H, Hydrogen Cooled electric generator for the Ribatejo Power Station (Ribatejo Power Station Block I).

Siemens supplied SGen5-2000H, Hydrogen Cooled electric generator for the Ribatejo Power Station (Ribatejo Power Station Block I).

Siemens supplied SGen5-2000H, Hydrogen Cooled electric generator for the Ribatejo Power Station (Ribatejo Power Station Block II).

Siemens supplied SGen5-2000H, Hydrogen Cooled electric generator for the Ribatejo Power Station (Ribatejo Power Station Block II).

Siemens supplied SGen5-2000H, Hydrogen Cooled electric generator for the Ribatejo Power Station (Ribatejo Power Station Block III).

Siemens supplied SGen5-2000H, Hydrogen Cooled electric generator for the Ribatejo Power Station (Ribatejo Power Station Block III).

Siemens Heat Transfer Technology supplied steam boiler for the Ribatejo Power Station (Ribatejo Power Station Block II).

Siemens Heat Transfer Technology supplied steam boiler for the Ribatejo Power Station (Ribatejo Power Station Block II).

Siemens Heat Transfer Technology supplied steam boiler for the Ribatejo Power Station (Ribatejo Power Station Block III).

Siemens Heat Transfer Technology supplied steam boiler for the Ribatejo Power Station (Ribatejo Power Station Block III).

For more details on Ribatejo Power Station, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.