Richmondale Pumped Storage Hydroelectric Project is a 230MW hydro power project. It is planned on Lackawanna river/basin in Pennsylvania, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2029 and is expected to enter into commercial operation in 2032. Buy the profile here.
Description
The project is being developed and currently owned by Merchant Hydro Developers.
Richmondale Pumped Storage Hydroelectric Project is a pumped storage project. The hydro reservoir capacity is planned to be 6.938 million cubic meter. The net head of the project will be 175.565m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock length will be 2,045.208m. The penstock diameter will be 1.219m. The project is expected to generate 676.873 MWh of electricity.
The hydro power project consists of 2 turbines.
The project has 2 electric generators that will be installed at the project site.
Development status
The project construction is expected to commence from 2029. Subsequent to that it will enter into commercial operation by 2032.
For more details on Richmondale Pumped Storage Hydroelectric Project, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.