Round Butte is a 372.5MW hydro power project. It is located on Deschutes river/basin in Oregon, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1964. Buy the profile here.
Description
The project is currently owned by Portland General Electric with a stake of 66.67%.
The hydro reservoir capacity is 659.91 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The penstock diameter is 4.267m. The project generated 997.892 GWh of electricity.
The hydro power project consists of 1 turbine with 112.5MW nameplate capacity.
The hydro power project consists of 2 turbines, each with 130MW nameplate capacity.
The project has 3 electric generators installed at the site.
Development status
The project got commissioned in 1964.
For more details on Round Butte, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.