Schwabeck is a 79MW hydro power project. It is located on Drau river/basin in Carinthia, Austria. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1939 and subsequently entered into commercial operation in 1942. Buy the profile here.

Description

The project is currently owned by VERBUND Hydro Power with a stake of 100%.

Schwabeck is a run-of-river project. The project generated 378 GWh of electricity.

Development status

The project construction commenced in 1939 and subsequently entered into commercial operation in 1942.

Contractors involved

The turbines for the hydro power project have been supplied by Andritz Hydro and Voith Hydro Holding.

The electric generators for the project were procured from ELIN Motoren and Siemens.

For more details on Schwabeck, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.