SDIC Datong Coal Fired Power Plant is a 270MW coal fired power project. It is located in Shanxi, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2010. Buy the profile here.
Description
It is a Steam Turbine power plant.
Development status
The project got commissioned in November 2010.
Contractors involved
Harbin Turbine was selected as the turbine supplier for the Coal fired project. The company supplied NKZ150-13.24/535/535 ultra-high pressure model steam turbines for the project.
Harbin Electric Machinery supplied QF-150-2 air-cooled, three-phase synchronous electric generator for the project.
Harbin Electric Machinery supplied QF-150-2 air-cooled, three-phase synchronous electric generator for the project.
Harbin Electric Machinery supplied QF-150-2 air-cooled, three-phase synchronous electric generator for the project.
Harbin Boiler supplied steam boiler for the project.
Harbin Boiler supplied steam boiler for the project.
Harbin Boiler supplied steam boiler for the project.
For more details on SDIC Datong Coal Fired Power Plant, buy the profile here.