Seyrantepe is a 59MW hydro power project. It is located on Peri river/basin in Elazig, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2005 and subsequently entered into commercial operation in 2008. Buy the profile here.

Description

The project is currently owned by Bilgin Enerji Yatirim Holding.

Seyrantepe is a reservoir based project. The gross head and net head of the project are 36m and 31m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The project generated 165 GWh of electricity. The project cost is $171.235m.

Development status

The project construction commenced in 2005 and subsequently entered into commercial operation in 2008.

Power purchase agreement

The power generated from the project is sold to Limak Insaat San Ve Tic under a power purchase agreement for a period of 44 years from 2008. The contracted capacity is 52.

Contractors involved

GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 25.7MW nameplate capacity.

GE Renewable Energy supplied 2 electric generators for the project.

For more details on Seyrantepe, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.