Shaturskaya GRES Combined Cycle Power Plant is a 400MW gas fired power project. It is located in Moscow, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2008 and subsequently entered into commercial operation in November 2010. Buy the profile here.

Description

The project is currently owned by Unipro with a stake of 100%.

It is a CCGT with Cogen power plant. The fuel is procured from NOVATEK.

The project cost is $586.449m.

Development status

The project construction commenced in 2008 and subsequently entered into commercial operation in November 2010.

Contractors involved

Gama Power Systems Engineering and Contracting and General Electric International were selected to render engineering procurement construction services for the gas fired power project.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of 9FA gas turbine.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of D10 steam turbine.

GE Power supplied 390H electric generator for the project.

GE Power supplied 390H electric generator for the project.

John Cockerill Group supplied steam boiler for the project.

John Cockerill Group supplied steam boiler for the project.

For more details on Shaturskaya GRES Combined Cycle Power Plant, buy the profile here.