Sherwood H Smith Jr Energy Complex is a 1,247.8MW gas fired power project. It is located in North Carolina, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 2002. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Sherwood H Smith Jr Energy Complex

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Duke Energy Progress with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant that is used for Baseload. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. The fuel is procured from Piedmont Natural Gas Pipeline.

The project generated 8,821,723MWh of electricity.

Development status

The project got commissioned in June 2002.

Contractors involved

Gemma Power Systems was selected to render engineering procurement construction services for the Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block I) project. KBR was selected to render engineering procurement construction services for the Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block II) project.

Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block I) is equipped with GE Power 7FA gas turbines. The phase consists of 2 gas turbines with 199.4MW nameplate capacity.

Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block I) is equipped with Toshiba Energy Systems and Solutions steam turbine. The phase consists of 1 steam turbine with 195.4MW nameplate capacity.

Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 271.1MW nameplate capacity.

Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block II) is equipped with Siemens SGT6-5000FD3 gas turbines. The phase consists of 2 gas turbines with 191.2MW nameplate capacity.

Nooter/Eriksen supplied steam boiler for the Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block I).

Vogt Power International supplied steam boiler for the Sherwood H Smith Jr Energy Complex (Sherwood H Smith Jr Energy Complex Block II).

For more details on Sherwood H Smith Jr Energy Complex, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.