Shigo Kas is a 102MW hydro power project. It is planned on Panjkora river/basin in Khyber Pakhtunkhwa, Pakistan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2027. Buy the profile here.
Description
The project is being developed and currently owned by SaifCo Hydropower.
Shigo Kas is a run-of-river project. The gross head and net head of the project will be 91.5m and 78.5m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock diameter will be 5.5m. The project is expected to generate 525 GWh of electricity.
The hydro power project consists of 3 turbines, each with 34MW nameplate capacity.
The project will have 3 electric generators installed at the project site. The generator capacity is likely to be 40 MVA.
Development status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2027.
For more details on Shigo Kas, buy the profile here.