Shizitan is a 51MW hydro power project. It is located on Longxi river/basin in Chongqing, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1954 and subsequently entered into commercial operation in 1956. Buy the profile here.
Description
The project is currently owned by State Power Investment.
Shizitan is a run-of-river project. The hydro reservoir capacity is 1,027 million cubic meter. The gross head of the project is 64.3m. The penstock length is 133.2m. The penstock diameter is 5m. The project generated 206 GWh of electricity.
The hydro power project consists of 3 turbines, each with 12MW nameplate capacity.
The hydro power project consists of 1 turbine with 15MW nameplate capacity.
The project has 4 electric generators installed at the site.
Development status
The project construction commenced in 1954 and subsequently entered into commercial operation in 1956.
Power purchase agreement
The power generated from the project is sold to State Grid Corporation of China under a power purchase agreement.
For more details on Shizitan, buy the profile here.