Shuiboxia is a 57MW hydro power project. It is located on Bailong river/basin in Gansu, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2006 and subsequently entered into commercial operation in 2010. Buy the profile here.

Description

The project is developed and owned by GEPIC Darong Electric Power.

Shuiboxia is a run-of-river project. The project generated 228.8 GWh of electricity.

The hydro power project consists of 3 turbines, each with 19MW nameplate capacity.

The project has 3 electric generators installed at the site.

Development status

The project construction commenced in 2006 and subsequently entered into commercial operation in 2010.

For more details on Shuiboxia, buy the profile here.

GlobalData