Simang-II is a 66MW hydro power project. It is planned on Simang river/basin in Arunachal Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2026 and is expected to enter into commercial operation in 2028. Buy the profile here.
Description
The project is being developed by Upper Simang Power and is currently owned by Adishankar Power.
Simang-II is a run-of-river project. The hydro reservoir capacity is planned to be 0.66 million cubic meter. The gross head and net head of the project will be 107m and 93.37m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 3 in number. The penstock length will be 56m. The penstock diameter will be 2.3m. The project is expected to generate 267.59 GWh of electricity.
The hydro power project consists of 3 turbines, each with 22MW nameplate capacity.
The project has 3 electric generators that will be installed at the project site.
Development status
The project construction is expected to commence from 2026. Subsequent to that it will enter into commercial operation by 2028.
For more details on Simang-II, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.