Song Con 2 Step 2 is a 60MW hydro power project. It is located on Song Con river/basin in Quang Nam, Vietnam. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2006 and subsequently entered into commercial operation in 2009. Buy the profile here.
Description
Song Con 2 Step 2 is a reservoir based project. The hydro reservoir capacity is 1.2 million cubic meter. The penstock length is 580m. The penstock diameter is 2.8m. The project generated 197.64 GWh of electricity.
The hydro power project consists of 3 turbines, each with 20MW nameplate capacity.
The project has 1 electric generator installed at the site. The generator capacity is 22.5 MVA.
Development status
The project construction commenced in 2006 and subsequently entered into commercial operation in 2009.
Contractors involved
Guangxi Electric Power Industry Investigation Design and Research Institute was selected to render engineering procurement construction services for the hydro power project.
For more details on Song Con 2 Step 2, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.