Sonico is a 60MW hydro power project. It is located on Oglio river/basin in Lombardy, Italy. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1928. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Sonico

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Electricite de France with a stake of 97.4%.

Sonico is a reservoir based project. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The penstock length is 852m. The penstock diameter is 1.7m. The project generated 148.89 GWh of electricity.

The hydro power project consists of 5 turbines, each with 14.2MW nameplate capacity.

The project has 5 electric generators installed at the site. The generator capacity is 16 MVA.

Development status

The project got commissioned in 1928.

For more details on Sonico, buy the profile here.

This content was updated on 25 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.